Port Geographe Boat Ramps

Port Geographe Boat Ramps

In November this year, Walcon completed the design and construction of three (3) new boat ramps and launching jetties at Port Geographe, in WA’s south-west.

Scope of works included demolition and removal of the three existing fixed jetties, concrete abutments and piles.

Walcon then installed three new floating boat launching jetties, each approximately 33m long, including new piles and concrete abutments. To ensure that boat users always had access to at least two ramps, each launching jetty was constructed individually.

The decking of choice was grey FRP Micro Mesh, providing a low-maintenance solution whilst maintaining a sleek appearance.

For Walcon, the Port Geographe boat ramps are a great addition to the region, adding to the previously supplied marina extension that Walcon completed a number of years ago.

Share:

Share on facebook
Facebook
Share on twitter
Twitter
Share on linkedin
LinkedIn

Related Posts

Marassi Marina Egypt

Walcon Marine Australasia, along with our Egyptian Partners, EDECS is supplying a turnkey marina installation for one of Egypt’s premier resort developments; Marassi, located 140

DDA Kayak Launch Floating Pontoon

Designed and built for SA Water for the Warren and Myponga Reservoirs in the Adelaide hills, these floating pontoon systems provide safe and compliant disabled

Princess Street Marina

Walcon has just completed the refurbishment of Arm A at the beautiful Princess Street Marina in Sydney’s north. The project included the demolition and removal

Carrington Boat Ramp

The Carrington Boat Ramp project for Transport for NSW [TfNSW] was completed in February 2021 with Walcon designing, fabrication and installing the 35m ramp floating

Dolans Bay Marina

Dolans Bay Marina located in Sydney’s south has recently undergone a pontoon replacement program with the demolition and removal of an aging concrete system and

In November this year, Walcon completed the design and construction of three (3) new boat ramps and launching jetties at Port Geographe, in WA’s south-west. Scope of works included demolition and removal of the three existing fixed jetties, concrete abutments and piles. Walcon then installed three new floating boat launching jetties, each approximately 33m long, including new piles and concrete abutments. To ensure that boat users always had access to at least two ramps, each launching jetty was constructed individually. The decking of choice was grey FRP Micro Mesh, providing a low-maintenance solution whilst maintaining a sleek appearance. For Walcon, the Port Geographe boat ramps are a great addition to the region, adding to the previously supplied marina extension that Walcon completed a number of years ago.